portfolio_page-template-default,single,single-portfolio_page,postid-64,ajax_fade,page_not_loaded,,qode-title-hidden,hide_top_bar_on_mobile_header,qode-child-theme-ver-1.0.0,qode-theme-ver-16.8,qode-theme-bridge,disabled_footer_top,qode_header_in_grid,wpb-js-composer js-comp-ver-6.1,vc_responsive,responsive-menu-slide-left
About This Project

BMD Culvert Works

 

  1. Slab Perp
  2. Insitu Culvert Works
  3. Suspended Slab Culvert Works
  4. Reo placement on suspended slab
  5. Stepped based slab for retaining wall
  6. Reo for stepped base slab
  7. Poured steps for retaining wall
  8. Concrete pour on insitu culvert works
  9. Ready for concrete
  10. Reo for retaining wall
  11. Concrete placement for retaining wall
  12. Final Slab before pour
  13. Pouring base slab
  14. Retaining wall reo
  15. Slab reo